| The KTEL-UL25 electric indoor smokeless grill, independently developed by SGC, goes beyond the conventional standards of BBQ grilling. |
| Advantage 1: Shorter waiting time for grilling. |

|
| Advantage 2: It cooks food tender and juicy. |
Reason 1: Because radiant heat from the surrounding walls envelops the food and heats it evenly.
Reason 2: Because the cooking time is short, the ingredients do not become tough.
Reason 3:The heat retention of the cast-iron cooking grate prevents uneven cooking.

|
| Advantage 3: The surface temperature of the grill grate is 292°F (25%) higher. |
 |
| Benefits of using KTEL *Compared with gas grills |
- Fewer employee injuries during cleaning (cuts, abrasions, and burns).
- Because there are fewer parts to clean daily, the cleaning time after closing is shorter.
- Because grilling is faster, orders increase and sales grow.
- SGC’s sales support is fast and accurate, and replacement parts are delivered quickly.
- Unlike gas grills, it does not consume oxygen in the restaurant.
- It is cheaper than gas grills.
- Because SGC accurately handles various government approval procedures, it is easier to pass building inspections and fire inspections.
- Electric grills do not have to worry about gas burner clogging caused by stubborn grease buildup, allowing them to maintain a stable temperature.
|
|
The ultimate machine for solving labor shortages.
|
Hand grill net washing is putting a strain on restaurant operations.
1. Scrubbing stubborn grease by hand for three hours is simply too demanding.
2. "Grill net washing + staff turnover = higher training costs.
3. Grill net washing duties are a key obstacle in recruiting new staff.
4. Higher labor costs are cutting into profits and straining the business.  |

|
| Advantage: Cost recovered in only 2 monthes!! |
20 BBQ tables × 3 grill net hwashing cycles = better cost efficiency
|
| Grill nets wash per day: 180 |
| Hand grill net washing labor cost: $13000 (per month) |
Cost to purchase a BBQ grill net and plate cleaner: $20,000 |
*Base on labor cost of $18/ hour, 8 hour shift per day + additional employee benefit costs.
|
| |
 |
|